Set up a structured Jira initiative inside an existing project (RW2, S4, MAINT, etc.) by creating Epics, Tasks, and Release issues. Supports two work streams — Platform (net-new features/products) and Enterprise (client Surfaces implementations). Use this skill when the user wants to create a new Jira project, initiative, or feature set — including when they provide a Confluence page with project details, or when they want to create Epics/Tasks/Releases in Jira. Automatically generates User Story, Expected Behaviour, and QA Acceptance Criteria for Platform tasks. Uses the standard TM-1 Jira template for Enterprise builds.
How this skill is triggered — by the user, by Claude, or both
Slash command
/renoworks-pm-toolkit:jira-project-setupThe summary Claude sees in its skill listing — used to decide when to auto-load this skill
Sets up a structured Jira initiative for either a **Platform** project (net-new feature or product build) or an **Enterprise** project (client Surfaces implementation). Branches into the appropriate workflow based on the PM's answer to the first question.
Sets up a structured Jira initiative for either a Platform project (net-new feature or product build) or an Enterprise project (client Surfaces implementation). Branches into the appropriate workflow based on the PM's answer to the first question.
CloudId: renoworks.atlassian.net
When this skill loads, greet the user with the following message before asking anything else. Start with one randomly selected greeting from the list below, then continue with the fixed copy that follows.
Random greeting pool — pick one at random each time:
Fixed copy (always follows the greeting):
"{Random greeting} Tell me what you're shipping and I'll handle the full Jira setup — Epics, Tasks, releases, estimates, dependencies, and a workback schedule, all in one shot.
I work across the following RW work streams:
- Platform — net-new features, product improvements, or client feature requests. I'll read your Project Charter from Confluence and generate structured tickets with User Stories and QA Acceptance Criteria.
- Enterprise — setting up Surfaces for a new enterprise client. I'll use the standard TM-1 ticket template and walk you through which tickets apply for this build.
So what will it be? Enterprise or Platform?"
Used for net-new product builds, feature development, or platform improvements. Tasks are derived from a Confluence Project Charter and include AI-generated User Story, Expected Behaviour, and QA Acceptance Criteria.
When the user selects Platform, respond with one randomly selected line from the pool below, then immediately follow it with the fixed copy and questions. Do not add anything between the random line and the fixed copy.
Random Platform response pool — pick one at random:
Fixed copy (always follows the random line):
"{Random line} I'll need a few details before we get started:
S4-21841 for Q2 2026) — this sets the Epic's parent so it appears in the master WBS plan view."All five are required before proceeding. Store the Legendary key — it is set as the parent on Epic creation. Store the developer counts per team and the scheduling dates — they are used throughout the workflow to estimate task dates and flag delivery risk.
Read the page using mcp__claude_ai_Atlassian__getConfluencePage.
From the page content, extract using your best judgment:
S4, RW2, MAINT) — ask user to confirm if unclearRW Pro, Surfaces, RW 2.0) — used in Task summary formattingBackend, Frontend, QA)If the page does not mention specific tasks or releases, ask the user what they'd like created before proceeding.
All Task summaries must follow this structure:
[TEAM] - [RW PRODUCT] - [TASK SUMMARY]
Examples:
Backend - RW Pro - Implement Roles and Permissions List Endpoint
Frontend - RW Pro - AppBuilder: Add per-role homeowner/contractor Instant Estimate toggles
QA - RW Pro - End-to-End Testing: AppBuilder, Surfaces, and Java API
TEAM: Derive from the deliverables/team table on the Confluence page (e.g. Backend, Frontend, QA). If a task spans teams or is unclear, ask the user.
RW PRODUCT: Extract from the page title or project description (e.g. RW Pro, Surfaces). Confirm with user if ambiguous.
TASK SUMMARY: A concise noun phrase — 4 to 7 words maximum. Avoid filler words like "Implement", "Add", "Update", "Handle". Lead with the subject or outcome instead. Bad: Implement Permission Override Endpoints for CAN_ORDER_EV_ESTIMATE. Good: CAN_ORDER_EV_ESTIMATE Permission Override Endpoints.
This convention does not apply to Epics or Deployment Release summaries.
Call mcp__claude_ai_Atlassian__getJiraProjectIssueTypesMetadata with the project key to confirm available issue types (Epic, Task, Story, Release, etc.).
For issue types you'll use (Epic, Task, Release), call mcp__claude_ai_Atlassian__getJiraIssueTypeMetaWithFields to determine:
parent field (team-managed projects) or Epic Link / customfield_10014 (company-managed projects)Generate all task content before doing anything in Jira. Use all available context: Confluence page content, Epic description, task summary.
For each Task, generate:
As a [user type], I want to [action], so that [benefit].Estimation rules — apply to every task:
Task description format (Jira wiki markup):
h2. User Story
As a [user type], I want to [action], so that [benefit].
h2. Expected Behaviour
* [behaviour]
h2. QA Acceptance Criteria
* [criterion]
h2. Effort Estimate
*Estimated:* Xh
*Basis:* [Page-specified | Page signal: M | Inferred: reason]
Then present the full plan for confirmation:
Project: {KEY}
Epics ({N}): {Epic 1}, {Epic 2}
Tasks ({N}):
Under {Epic 1}: [{Team}] {Summary} (~Xh) — [one-line User Story]
Releases ({N}): {Release 1}
Total estimated effort: ~Xh | Schedule: {start} → ~{projected end}
Ask: "Shall I proceed? Any changes to epics, tasks, or estimates?"
Wait for explicit confirmation before continuing.
Run all Epic duplicate checks in parallel — each JQL lookup is independent:
project = {KEY} AND issuetype = Epic AND summary ~ "{epic name}" ORDER BY created DESC
mcp__claude_ai_Atlassian__createJiraIssue with labels: ["WBS"] and parent set to the Legendary ticket key from Step 1 — this places the Epic under the correct Legendary in the master WBS plan viewEpic creations can also run in parallel once all lookups complete.
Create all Tasks in parallel for efficiency using mcp__claude_ai_Atlassian__createJiraIssue with:
issuetype: Task (or Story if that's the appropriate type)summary: formatted as [TEAM] - [RW PRODUCT] - [TASK SUMMARY] (see Step 2 naming convention)description: the generated wiki-markup content from Step 4 (User Story, Expected Behaviour, QA Acceptance Criteria, and Effort Estimate sections)timeoriginalestimate: the estimate in seconds (e.g. 8h → 28800). Always set this field — it maps to the "Original Estimate" field in Jira. If Step 3 metadata indicates it is unavailable, notify the user rather than silently skipping it.labels: ["WBS"] — always include this label on every Task so it appears on the master workback scheduleparent field (team-managed) or customfield_10014 (company-managed) based on Step 3 metadataCreate each Release issue using mcp__claude_ai_Atlassian__createJiraIssue with:
issuetype: Deployment Release (or the matching type from Step 3 metadata)summary: formatted as {Initiative Name} - Dev Release (e.g. RW Pro - Instant Estimate - Homeowner/Contractor Toggle Feature - Dev Release)description: any description from the Confluence pagelabels: ["WBS"] — always include this label on every Release so it appears on the master workback scheduleAfter creating the Dev Release, link every Task created in Step 6 to it using mcp__claude_ai_Atlassian__createIssueLink:
inwardIssue: the Task key (the blocker)outwardIssue: the Dev Release key (the blocked issue)linkType: BlockerThis results in each Task showing "blocks" → Dev Release, and the Dev Release showing "is blocked by" ← Task.
Create all Task→Release links in parallel for efficiency.
After all Tasks and Releases are created, review every ticket holistically and infer dependencies using the following signals:
Dependency signals to look for:
Output a dependency map before creating any links:
Dependency Map:
{KEY} ({Summary}) → blocks → {KEY} ({Summary})
Reason: [one-line explanation]
Ask: "Does this dependency map look correct? Any changes before I create the links?"
Wait for explicit confirmation.
Create the links using mcp__claude_ai_Atlassian__createIssueLink:
inwardIssue: the blocking task keyoutwardIssue: the blocked task keylinkType: BlockerCreate all dependency links in parallel for efficiency. Do not re-create any links already established in Step 7 (Task → Release blocker links).
Use the project start date and target delivery date collected in Step 1.
Apply these rules consistently when calculating dates:
ceil(estimate_hours / 6) working days. A 4h task = 1 day; a 8h task = 2 days; a 14h task = 3 days (always round up).Output a schedule table before setting any dates. Columns: Key | Summary | Est | Start | Due | Depends On. End with total project duration and date range.
If a target delivery date was provided and the calculated end date exceeds it, flag the risk clearly:
"⚠ Schedule risk: projected completion is YYYY-MM-DD, which is X days past the target of YYYY-MM-DD."
Ask: "Does this schedule look correct? Any adjustments before I apply the dates to Jira?"
Wait for explicit confirmation.
For each Task and Release issue, call mcp__claude_ai_Atlassian__editJiraIssue to set:
startDate — the calculated start date in YYYY-MM-DD formatduedate — the calculated due date in YYYY-MM-DD formatIf either field is unavailable (per Step 3 metadata), notify the user rather than silently skipping it.
Known limitation — company-managed projects: The built-in
startDate/customfield_10015field is system-managed ("LOCKED") in company-managed Jira projects and cannot be set via the REST API. If it fails, notify the user and ask them to make the field editable via Jira admin settings before retrying. Theduedatefield is standard and always works.
Apply all date updates in parallel for efficiency.
Output a table of all created and reused issues:
| Type | Key | Summary | Estimate | Start | Due | Blocks |
|---|---|---|---|---|---|---|
| Epic (existing) | S4-123 | ... | — | — | — | — |
| Epic (created) | S4-456 | ... | — | — | — | — |
| Task | S4-457 | ... | 8h | 2025-06-03 | 2025-06-04 | S4-460 |
| Release | S4-458 | ... | — | 2025-06-10 | 2025-06-10 | — |
Include direct Jira links where possible: https://renoworks.atlassian.net/browse/{KEY}
After the table, generate two ready-to-paste paragraphs for posting in the Teams project channel.
Format:
{Initiative Full Name} - Project Charter - {Confluence page URL}
{Project Charter paragraph}
{Initiative Full Name} - Jira Project - {Epic URL}
{Jira Epic paragraph}
Project Charter paragraph — Write 2–3 sentences describing the purpose of the Confluence page. Use this structure as a guide:
Tailor the specifics to the actual project — mention the delivery phases and team structure as they appear on the Confluence page, rather than using generic language.
Jira Epic paragraph — Write 2–3 sentences summarizing the scope of work created in Jira. Use this structure as a guide:
Use the actual task counts, team names, and total hours from the session. Format the total as "~Xh".
Used for enterprise client Surfaces implementations. The ticket structure follows the official TM-1 Jira template and is consistent across every client build. Tasks are templated — no User Story or QA Acceptance Criteria generation is needed.
The standard workflow is: create all tickets from the template → transition any out-of-scope tickets to Archived status so they remain accessible if needed later.
When the user selects Enterprise, respond with one randomly selected line from the pool below, then immediately follow it with the fixed copy and questions. Do not add anything between the random line and the fixed copy.
Random Enterprise response pool — pick one at random:
Fixed copy (always follows the random line):
"{Random line} I'll need a few details before we get started:
ProDoor Systems)"SOW-PRODOOR-002)"S4)"S4-23228 for Q3 2026) — this sets the Epic's parent so it appears in the master WBS plan view."Required: all except Figma, CRM name, and target delivery date. Store the Legendary key — it is set as the parent on Epic creation. Read the App Configuration Confluence page using mcp__claude_ai_Atlassian__getConfluencePage to inform task descriptions.
Present the full template ticket list and ask the PM to confirm scope in a single round. Tickets marked [Archived in template] are off by default — include them only if the PM explicitly confirms they're needed. All others are on by default.
Enterprise Template Tickets — [Client Name] [SOW-REF]
EPIC
[✓] [Client Name] [SOW-REF] (Epic)
DEV
[✓] DevOps - Vanity URL (Story)
[✓] Backend - CRM Integration (Story) ← CRM: [name from Step 1E, or "TBD" if not provided]
DPL
[✓] DPL - [PROJECT SET UP] Asset Review & Requirements (DPL Task)
SAMPLE PHOTO
[✓] SP - Mask and deploy new sample images (DS Task) ← How many exterior scenes?
[✓] SP - Prepare shadow files for new sample images (DS Task)
[✓] SP - Implement sample photo tabs (DS Task)
[✓] SP - Update and deploy repo images (DS Task)
[✓] SP - Hotspot positioning (DS Task)
RELEASE
[✓] Release [Client Name] New Build OR Upgrade (Deployment Release)
--- Archived in template (include only if in scope for this build) ---
[ ] Initial Build - DSA Analytics Setup (Task)
[ ] Design Team - Create branding mock-ups (Task)
[ ] Backend - 3D Product Viewer Deployment (Task)
[ ] Frontend - Complete all S4 Configurations and Styling (Task)
[ ] Projects - Configure S4 App in Configuration Portal (Task)
[ ] Backend - Configure New Build S4 App (Task)
Ask: "Please confirm which tickets are in scope and how many exterior sample scenes SP will need to mask. If any of the archived tickets should be included, let me know. I'll show the full plan with estimates before creating anything."
Once the PM responds, generate the full plan summary using the confirmed ticket set and the default estimates from Step 9E, then present it:
Project: {KEY}
Epic (1): [Client Name] [SOW-REF]
Tickets to create — Active ({N}):
Story | DevOps - Vanity URL | 4h
Story | Backend - CRM Integration | 16h
DPL Task | DPL - [PROJECT SET UP] Asset Review & Requirements | 4h
DS Task | SP - Mask and deploy new sample images ({N} scenes) | {N×4}h
DS Task | SP - Prepare shadow files for new sample images | 4h
DS Task | SP - Implement sample photo tabs | 4h
DS Task | SP - Update and deploy repo images | 4h
DS Task | SP - Hotspot positioning | 4h
Release | Release [Client Name] New Build | —
Tickets to create — Archived ({M}):
Task | [any archived-by-default tickets included]
Total estimated effort: ~Xh
Schedule: {start date} → ~{projected end date}
Ask: "Does this look right? Any changes before I create the tickets?"
Wait for explicit confirmation before continuing.
Call mcp__claude_ai_Atlassian__getJiraProjectIssueTypesMetadata with the project key to confirm available issue types. For Enterprise projects, confirm availability of:
DPL Task — Digital Product Library workDS Task — Design Services / Sample Photo workStory — DevOps and Backend/Frontend setupTask — standalone dev or design tasksDeployment Release — release milestoneRun all of the following calls in parallel:
mcp__claude_ai_Atlassian__getJiraIssueTypeMetaWithFields for each issue type in use — to determine required fields and Epic linking methodmcp__claude_ai_Atlassian__getTransitionsForJiraIssue on any existing issue in the target project — to find the transition ID for the Archived status (needed in Step 6E)Search for an existing Epic to avoid duplicates:
project = {KEY} AND issuetype = Epic AND summary ~ "{Client Name}" ORDER BY created DESC
mcp__claude_ai_Atlassian__createJiraIssue with parent set to the Legendary ticket key from Step 1E — this places the Epic under the correct Legendary in the master WBS plan view.Epic description (Jira wiki markup):
This is an epic for creation of site: `[app-name derived from App Config page]`
Related documentation:
* Confluence Page: [Client Name - App Configuration|{Confluence App Config URL}]
* Basecamp Folder: [{Basecamp URL}|{Basecamp URL}]
*TO-DO*:
# Fill in site name and documentation.
# Fill in sub-ticket details for all sub-tickets. (if applicable)
# Mark tickets not needed as "Not Accepted".
# Set End-Date for ticket when DOD is sent for project closure.
Include labels: ["WBS"] on the Epic.
Create all confirmed tickets using mcp__claude_ai_Atlassian__createJiraIssue. Run parallel creation calls for tickets with no dependencies between them. Use the exact descriptions below — replace placeholders in [brackets] with actual client values from Step 1E and the App Config Confluence page.
Epic link: use parent field (team-managed) or customfield_10014 (company-managed) based on Step 3E metadata.
Always include WBS on every Enterprise ticket, plus the per-ticket label defined below.
Dev-BackendCreate a vanity URL (URL to be confirmed by `[client-name]`).
URL: `visualizer.[app-name].com`
Vanity URLs
{code}
visualizer.[app-name].com => [app-name].renoworks.com
visualizer-api.[app-name].com => api.renoworks.com
{code}
[Setting up Vanity URLs|https://renoworks.atlassian.net/wiki/spaces/S3/pages/1770291250/Setting+up+Vanity+URLs]
Add the API vanity domain to the "connect-src" and "img-src" CSP directives in default.js in surfaces config
Dev-Frontend`[CRM Name]` Integration is required for `[app-name]`. ← Fill these out before assigning.
Link to CRM confluence page: INSERT LINK HERE PRIOR TO ASSIGNING OUT (Should be provided by [TM-44|https://renoworks.atlassian.net/browse/TM-44])
Add to Documentation: [CRM Integration Platform|https://renoworks.atlassian.net/wiki/spaces/COR/pages/318079092/CRM+Integration+Platform]
Back-End Documentation (Reference): [CRM platform|https://renoworks.atlassian.net/wiki/spaces/BAC/pages/315064549/CRM+platform], [Backend - Steps for CRM Integration|https://renoworks.atlassian.net/wiki/spaces/BAC/pages/1720680515/Backend+-+Steps+for+CRM+Integration]
Back-End Package: [https://bitbucket.org/renoworks/framework/src/master/src/com/renoworks/framework/objects/crm/|https://bitbucket.org/renoworks/framework/src/master/src/com/renoworks/framework/objects/crm/]
DPL[{Basecamp URL}|{Basecamp URL}]
h3. ASSET LIST ---
_*Instructions:*_
* _*Assign to Project Coordinator once asset list is provided.*_
* _*Provide Asset List and update the date in the log once the list is provided. This asset sheet may also be provided as an external google sheet.*_
* _*Ensure the use of the following statuses:*_
*[ PENDING ]* *[ RECEIVED ]* *[ CLARIFICATION NEEDED ]*
* *Asset* *[ PENDING ]*
** Manufacturer & product ID
* *Asset* *[ CLARIFICATION NEEDED ]*
* *Asset* *[ RECEIVED ]*
----
h3. QUESTIONS & CLARIFICATIONS
_*Instructions*_
* _*Ensure the use of the following statuses:*_
*[ PENDING ]* *[ RECEIVED ]* *[ CLARIFICATION NEEDED ]*
* _*Use the format defined below*_
* _Question:_ *[ PENDING ]* *[ RECEIVED ]* *[ CLARIFICATION NEEDED ]*
** Answer:
----
h3. NOTES
* _Additional Notes For A Project_
----
h3. LOG
|| *Project Set Up Date* || *Date Asset List Provided* || *Date Assets Received* || *Date Assets Reviewed* || *Date Assets Approved* ||
| {today's date} | | | | |
SampleProjectsMask new images found in client basecamp folder. Shadow files will need to be prepared. Supergrouping as needed.
Single source of truth is app configuration page (linked in main epic)
Layer names are displayed in layer mapping table
SampleProjectsPrepare shadow files for new sample images found in client basecamp folder. Ensure these are uploaded to the correct GUID and set opacity.
SampleProjects(No description — leave blank, matching template)
SampleProjectsSelected repo images found on app configuration page, linked in main epic
Please update xml to align with the appropriate layer names as referenced in the layer mapping table.
SampleProjects(No description — leave blank, matching template)
WBSUse Release [Client Name] New Build or Release [Client Name] Upgrade based on the PM's answer from Step 1E.
h2. Deployment task
# Execute a *[DEV/SP/DPL]** deployment of the App to the requested Server (see status).
# Check [Deployment Specific Instructions|https://renoworks.atlassian.net/wiki/spaces/S3/pages/317390995/Deployments+Specific+Instructions] (if Applicable).
# Run the app through the automated/manual testing to confirm that the site is ready for testing.
# For releases to a Production environment only - Before executing the deployment script, please notify DS team to ensure that maskers are not actively using the app. This is not applicable if the App uses the Scene Editor.
----
h2. QA task
# Execution of [Deployment Release QA Checklist|https://renoworks.atlassian.net/wiki/spaces/QA1/pages/313851932/Deployment+Release+QA+Checklist]
# Confirmation that App satisfies all requested verifications on the requested environment
*Exceptions*
* DS / DPL tickets when there is no explicit request
* Known Issues according to App backlog / Core backlog
----
*Purpose*: Implementation of baseline scope
----
*Release setup:**
# This release has to be assigned to the team who is responsible of the SOW/CR.
# If required work from other teams, a subrelease task has to be setup properly.
# Please ensure that all team-specific blockers are linked to this subrelease, including non-team-specific tickets which block team tasks.
For each ticket confirmed as in scope from the "Archived in template" list, create it with the description below:
Initial Build - DSA Analytics Setup (Task) — label: WBS
The sub tasks within this ticket need to be completed by the DSA team before the APP goes live.
*Go Live Date:* TBD
h2. Ticket Details
*Prod URL / Staging URL:*
*Confluence:*
Design Team - Create branding mock-ups (Task) — label: WBS
Fill in the Basecamp link and target completion date from Step 1E context. Leave feature toggles (ON/OFF) as written — the design team fills these in:
*Branding Assets & Background image:* [{Basecamp URL}|{Basecamp URL}]
*Particularities:*
* Version 4.20
* New Toolbar
* React Landing page
* Legacy Link ON/OFF
* Sample Homes ON/OFF (Button copy: "Sample Gallery")
* AI ON/OFF (Button copy: "AI Instant Design")
* DIY ON/OFF (Button copy: "Upload Home") _*only enabled if separate access from AI is requested in the SOW_
* Design Services ON/OFF (Button copy: "Design Services")
* Get Started Page ON/OFF (Button copy: "Design Your Home") _*i.e. as seen in Ply Gem_
* Header CTA ON/OFF (Button copy: TBD)
Please aim to have this completed by [target date from Step 1E, or XX 202X if not specified]. Let me know if you have any questions.
Backend - 3D Product Viewer Deployment (Task) — label: WBS
_BA to add information when defining DPL components post asset collection._
Frontend - Complete all S4 Configurations and Styling (Task) — label: WBS
Complete all S4 configurations and styling in alignment with the app configuration page: [Client Name - App Configuration|{Confluence App Config URL}]
Projects - Configure S4 App in Configuration Portal (Task) — label: WBS
Configure S4 App in Configuration Portal
Backend - Configure New Build S4 App (Task) — label: WBS
Configure a new build S4 visualizer in alignment with the app configuration page [Client Name - App Configuration|{Confluence App Config URL}]
This includes any applicable:
* Implementing AI mapping
* Assign a product manufacturer
For any tickets that were created but are not in scope for this build (i.e., those the PM indicated are not needed), transition them to the Archived status using mcp__claude_ai_Atlassian__transitionJiraIssue with the Archived transition ID found in Step 3E.
Run all archive transitions in parallel for efficiency.
Link every active (non-Archived) ticket to the Release using mcp__claude_ai_Atlassian__createIssueLink:
inwardIssue: the ticket key (the blocker)outwardIssue: the Release key (the blocked issue)linkType: BlockerCreate all links in parallel for efficiency.
For Enterprise projects, present this standard dependency map for PM confirmation before creating links. These are inter-ticket dependencies only — ticket-to-Release links were already created in Step 7E and must not be duplicated here.
Dependency Map:
DPL Asset Review → blocks → [all other DPL tickets]
Reason: Asset requirements must be confirmed before DPL production work begins
SP - Mask and deploy → blocks → SP - Prepare shadow files
Reason: Shadow files are prepared from the same images being masked
SP - Prepare shadow files → blocks → SP - Update and deploy repo images
Reason: Repo images depend on shadow files being ready
Ask: "Does this dependency map look correct for this project? Any additions or removals?"
Wait for explicit confirmation, then create links using mcp__claude_ai_Atlassian__createIssueLink with linkType: Blocker. Do not re-create any links already created in Step 7E.
Use the project start date and target delivery date from Step 1E.
Use these default estimates for each ticket unless the PM provides alternatives:
| Ticket | Team | Default Estimate |
|---|---|---|
| DevOps - Vanity URL | DevOps | 4h |
| Backend - CRM Integration | Backend | 16h |
| DPL - Asset Review & Requirements | DPL | 4h |
| SP - Mask and deploy new sample images | SP | 8h (adjust based on scene count) |
| SP - Prepare shadow files | SP | 4h |
| SP - Implement sample photo tabs | SP | 4h |
| SP - Update and deploy repo images | SP | 4h |
| SP - Hotspot positioning | SP | 4h |
| Initial Build - DSA Analytics Setup | DSA | 8h |
| Design Team - Create branding mock-ups | Design | 8h |
| Backend - 3D Product Viewer Deployment | Backend | 8h |
| Frontend - Complete all S4 Configurations | Frontend | 16h |
| Projects - Configure S4 App | Projects | 8h |
| Backend - Configure New Build S4 App | Backend | 16h |
Apply the same scheduling rules as the Platform path:
ceil(estimate_hours / 6) working days, rounded upOutput a schedule table before setting any dates. Columns: Key | Summary | Type | Est | Start | Due | Depends On.
If a target delivery date was provided and the calculated end date exceeds it, flag the risk:
"⚠ Schedule risk: projected completion is YYYY-MM-DD, which is X days past the target of YYYY-MM-DD."
Ask: "Does this schedule look correct? Any adjustments before I apply the dates to Jira?"
Wait for explicit confirmation.
For each active ticket, call mcp__claude_ai_Atlassian__editJiraIssue to set:
startDate — calculated start date in YYYY-MM-DD formatduedate — calculated due date in YYYY-MM-DD formatSkip date-setting on any tickets transitioned to Archived.
Known limitation:
startDatemay be locked in company-managed projects. Notify the user if it fails.
Apply all date updates in parallel for efficiency.
Output a table of all created issues:
| Type | Key | Summary | Status | Estimate | Start | Due |
|---|---|---|---|---|---|---|
| Epic | S4-xxx | [Client Name] [SOW-REF] | To Do | — | — | — |
| Story | S4-xxx | DevOps - Vanity URL | To Do | 4h | ... | ... |
| DPL Task | S4-xxx | DPL - [PROJECT SET UP] Asset Review & Requirements | To Do | 4h | ... | ... |
| Task | S4-xxx | Design Team - Create branding mock-ups | Archived | — | — | — |
| ... | ||||||
| Release | S4-xxx | Release [Client Name] New Build | To Do | — | ... | ... |
Include direct Jira links where possible: https://renoworks.atlassian.net/browse/{KEY}
After the table, generate two ready-to-paste paragraphs for posting in the Teams project channel.
Format:
[Client Name] [SOW-REF] - App Configuration - {Confluence App Config URL}
{App Config paragraph}
[Client Name] [SOW-REF] - Jira Epic - {Epic URL}
{Jira Epic paragraph}
App Config paragraph — 2–3 sentences: what the App Config page is, what it covers (product catalogue, branding, configuration requirements, sample scenes), and that it's the single source of truth for all implementation work.
Jira Epic paragraph — 2–3 sentences: reference the SOW and App Config as scope sources, describe the ticket breakdown (how many Dev/DPL/SP tickets are active), and state the total estimated effort as ~Xh.