Conduct a Computer Systems Validation assessment using GAMP 5 risk-based methodology for regulated environments.
Conduct a Computer Systems Validation assessment using GAMP 5 risk-based methodology for regulated environments.
Classify the system:
| Category | Type | Example | Validation Effort |
|---|---|---|---|
| 1 | Infrastructure software | OS, firmware | Low — verify installation |
| 3 | Non-configured product | COTS as-is | Low-Medium — verify functionality |
| 4 | Configured product | LIMS with config | Medium-High — verify configuration |
| 5 | Custom application | Bespoke R/Shiny app | High — full lifecycle validation |
Expected: Category clearly assigned with rationale documented. On failure: If category is ambiguous, default to the higher category and document the rationale.
Create a URS document with numbered requirements:
# User Requirements Specification
## System: [System Name] v[Version]
## Document ID: URS-[SYS]-[NNN]
### 1. Purpose
[Intended use statement]
### 2. Functional Requirements
| ID | Requirement | Priority | Source |
|----|-------------|----------|--------|
| URS-001 | System shall calculate BMI from height and weight inputs | Must | Regulatory SOP-xxx |
| URS-002 | System shall generate audit trail entries for all data changes | Must | 21 CFR 11.10(e) |
| URS-003 | System shall export results in PDF format | Should | User request |
### 3. Non-Functional Requirements
| ID | Requirement | Priority | Source |
|----|-------------|----------|--------|
| URS-010 | System shall respond within 3 seconds for standard queries | Should | Usability |
| URS-011 | System shall restrict access via role-based authentication | Must | 21 CFR 11.10(d) |
### 4. Data Integrity Requirements
[ALCOA+ requirements: Attributable, Legible, Contemporaneous, Original, Accurate]
### 5. Regulatory Requirements
[Specific 21 CFR Part 11, EU Annex 11, or other applicable requirements]
Expected: All requirements have unique IDs, priorities, and traceability to source. On failure: Flag requirements without clear source or priority for stakeholder review.
Apply GAMP 5 risk-based approach using a Failure Mode and Effects Analysis (FMEA):
# Risk Assessment
## Document ID: RA-[SYS]-[NNN]
| Req ID | Failure Mode | Severity (1-5) | Probability (1-5) | Detectability (1-5) | RPN | Risk Level | Mitigation |
|--------|-------------|----------------|-------------------|---------------------|-----|------------|------------|
| URS-001 | Incorrect BMI calculation | 4 | 2 | 1 | 8 | Low | OQ test case |
| URS-002 | Audit trail entries missing | 5 | 3 | 3 | 45 | High | IQ + OQ + monitoring |
| URS-011 | Unauthorized access | 5 | 2 | 2 | 20 | Medium | OQ test + periodic review |
Risk Priority Number (RPN) = Severity x Probability x Detectability.
| RPN Range | Risk Level | Testing Requirement |
|---|---|---|
| 1–12 | Low | Basic verification |
| 13–36 | Medium | Documented test case |
| 37+ | High | Full IQ/OQ/PQ with retest |
Expected: Every URS requirement has a corresponding risk assessment row. On failure: Escalate unassessed requirements to the validation lead before proceeding.
# Validation Plan
## Document ID: VP-[SYS]-[NNN]
### Scope
- System: [Name] v[Version]
- GAMP Category: [N]
- Validation approach: [Prospective / Retrospective / Concurrent]
### Qualification Stages
| Stage | Scope | Applies? | Rationale |
|-------|-------|----------|-----------|
| IQ | Installation correctness | Yes | Verify installation, dependencies, configuration |
| OQ | Operational requirements | Yes | Verify functional requirements from URS |
| PQ | Performance under real conditions | [Yes/No] | [Rationale] |
### Roles and Responsibilities
| Role | Name | Responsibility |
|------|------|---------------|
| Validation Lead | [Name] | Plan, coordinate, approve |
| Tester | [Name] | Execute test scripts |
| System Owner | [Name] | Approve for production use |
| QA | [Name] | Review and sign-off |
### Acceptance Criteria
- All critical test cases pass
- No unresolved critical or major deviations
- Traceability matrix complete
Expected: Validation plan approved by all stakeholders before test execution. On failure: Do not proceed to test execution without an approved validation plan.
Write test scripts for each qualification stage:
# Operational Qualification Protocol
## Test Case: TC-OQ-001
## Traces to: URS-001
**Objective:** Verify BMI calculation accuracy
**Prerequisites:**
- System installed per IQ protocol
- Test data set prepared
**Test Steps:**
| Step | Action | Expected Result | Actual Result | Pass/Fail |
|------|--------|-----------------|---------------|-----------|
| 1 | Enter height=180cm, weight=75kg | BMI displayed as 23.15 | | |
| 2 | Enter height=160cm, weight=90kg | BMI displayed as 35.16 | | |
| 3 | Enter height=0, weight=75kg | Error message displayed | | |
**Tester:** _________ Date: _________
**Reviewer:** _________ Date: _________
Expected: Every medium- and high-risk requirement has at least one test case. On failure: Add missing test cases before execution begins.
Create a Requirements Traceability Matrix (RTM) linking every requirement through risk assessment to test cases:
# Traceability Matrix
## Document ID: TM-[SYS]-[NNN]
| URS ID | Requirement | Risk Level | Test Case(s) | Test Result | Status |
|--------|-------------|------------|--------------|-------------|--------|
| URS-001 | BMI calculation | Low | TC-OQ-001 | Pass | Verified |
| URS-002 | Audit trail | High | TC-IQ-003, TC-OQ-005 | Pass | Verified |
| URS-003 | PDF export | Low | TC-OQ-008 | Pass | Verified |
| URS-011 | Role-based access | Medium | TC-OQ-010, TC-OQ-011 | Pass | Verified |
Expected: 100% of URS requirements appear in the traceability matrix with linked test results. On failure: Any requirement without a linked test result is flagged as a validation gap.
# Validation Summary Report
## Document ID: VSR-[SYS]-[NNN]
### 1. Executive Summary
[System name] v[version] has been validated in accordance with [VP document ID].
### 2. Validation Activities Performed
| Activity | Document ID | Status |
|----------|-------------|--------|
| User Requirements | URS-SYS-001 | Approved |
| Risk Assessment | RA-SYS-001 | Approved |
| Validation Plan | VP-SYS-001 | Approved |
| IQ Protocol/Report | IQ-SYS-001 | Executed — Pass |
| OQ Protocol/Report | OQ-SYS-001 | Executed — Pass |
| Traceability Matrix | TM-SYS-001 | Complete |
### 3. Deviations
| Dev ID | Description | Impact | Resolution |
|--------|-------------|--------|------------|
| DEV-001 | [Description] | [Impact assessment] | [Resolution and rationale] |
### 4. Conclusion
The system meets all user requirements as documented in [URS ID]. The validation is considered [Successful / Successful with conditions].
### 5. Approval
| Role | Name | Signature | Date |
|------|------|-----------|------|
| Validation Lead | | | |
| System Owner | | | |
| Quality Assurance | | | |
Expected: Report references all validation deliverables with clear pass/fail conclusion. On failure: If deviations are unresolved, the report must state "conditional" status with CAPA references.
setup-gxp-r-project — project structure for validated R environmentswrite-validation-documentation — IQ/OQ/PQ protocol and report writingimplement-audit-trail — audit trail implementation for electronic recordsvalidate-statistical-output — statistical output verification methodologyconduct-gxp-audit — auditing validated systemsnpx claudepluginhub pjt222/agent-almanacPlans and executes GxP audits of computerized systems and processes, covering opening meetings, evidence collection, finding classification, CAPA generation, and report writing. Use for scheduled internal audits, supplier qualification, pre-inspection readiness, or for-cause audits.
Guides gap analysis, document creation, and compliance checks for ISO 13485:2016 medical device QMS certification. Helps prepare Quality Manuals, SOPs, and Medical Device Files.
Prepares ISO 13485 certification documentation for medical device QMS, including gap analysis, Quality Manuals, procedures, and Medical Device Files.