Creates a structured renovation plan with timeline, contractor coordination, and scope-of-work document. Useful for home improvement projects.
How this skill is triggered — by the user, by Claude, or both
Slash command
/grimoire:design-renovation-project-planThe summary Claude sees in its skill listing — used to decide when to auto-load this skill
Create a structured, phase-by-phase renovation plan with scope, budget alignment, and contractor sequencing.
Create a structured, phase-by-phase renovation plan with scope, budget alignment, and contractor sequencing.
Adopted by: NKBA-certified designers, NAHB member contractors, professional remodeling firms nationwide Impact: Projects with formal plans are 40% less likely to exceed budget; proper sequencing reduces rework by 60%; detailed scope documents cut change orders by 35% Why best: Sequential trade coordination prevents costly rework (e.g., tiling before plumbing rough-in); written scope eliminates verbal misunderstandings that cause disputes
Sources: NKBA Planning Guidelines (2023); NAHB Remodeling Guidelines (2022); HomeAdvisor True Cost Guide (2023)
Define scope boundaries — List every room, surface, and system being touched. Write what is explicitly OUT of scope to prevent scope creep.
Assess existing conditions — Walk every affected area; photograph and document structural, electrical, plumbing, and HVAC conditions before any demo.
Identify permit requirements — Contact local building department; structural, electrical, plumbing, and HVAC work typically requires permits. Factor permit timelines (2–8 weeks) into schedule.
Sequence trades correctly — Follow: demo → structural → rough plumbing → rough electrical → HVAC → insulation → drywall → finish carpentry → tile/flooring → cabinets → finish plumbing/electrical → paint → final trim.
Create a work breakdown structure (WBS) — Break each trade phase into discrete tasks with duration estimates. Use a Gantt chart or spreadsheet.
Source and vet contractors — Get 3 bids per trade; verify license, insurance (general liability + workers' comp), and references. Never award to lowest bid alone.
Establish a communication cadence — Schedule weekly site walkthrough with general contractor; require written change-order approval before any out-of-scope work begins.
Build contingency into schedule — Add 20% buffer to total duration for inspections, material delays, and weather.
Document daily progress — Keep a project log with photos; note material deliveries, inspections passed/failed, and decisions made.
Plan the punch list — Two weeks before final, walk the site with each trade and document deficiencies; set a deadline for correction before final payment.
npx claudepluginhub jeffreytse/grimoire --plugin grimoireEstimates total home renovation costs with line-item budgets by trade, contingency allocation, and ROI benchmarking against industry data.
Provides guidance on interior design client management: writing proposals, managing scope, handling change orders, budget discussions, and timeline planning.
Produces architectural drawing sets, specifications, schedules, and construction administration workflows. Use when creating or reviewing construction documents for building projects.